Abstract
The construction industry in Ireland has been the sector hit the hardest during the recession with a potential return to output volumes of the mid-1990s. In order to compete within this struggling construction sector the traditional way of doing business must be re-engineered. One of the ways to achieve this is by introducing the Facilities Management (FM) process much earlier into the construction process, in order to maximize long term sustainability, and above all whole life construction costs. This paper will focus on a recently constructed sports clinic in Dublin, in which an aggressive programme was introduced around energy management savings.The data collation methodology included in depth structured interviews with members of the Architectural/ Engineering/Construction and Facilities Management (AEC /FM) teams involved in the original construction and current operation of this building. There was also additional data collected and analyzed through the use of a questionnaire survey distributed to a number of senior academics and professionals within the AEC / FM sector, in order to triangulate all the research findings. The research findings strongly advocate that the FM process should be applied as a business strategy throughout the design and construction stage, so as to reduce possible sustainability impacts and life cycle costs. This approach could potentially maximise the usability of the structure and ensure that criteria that are usually overlooked at construction are properly addressed at the outset of a project.
| Original language | English |
|---|---|
| DOIs | |
| Publication status | Published - 23 Jan 2012 |
| Event | Joint CIB W070, W092 & Tg72 International Conference On Facilities Management, Procurement Systems And Public Private Partnership - Cape Town, South Africa Duration: 23 Jan 2012 → 25 Jan 2012 |
Conference
| Conference | Joint CIB W070, W092 & Tg72 International Conference On Facilities Management, Procurement Systems And Public Private Partnership |
|---|---|
| Country/Territory | South Africa |
| City | Cape Town |
| Period | 23/01/12 → 25/01/12 |
| Other | Delivering Value to the Community |
Keywords
- construction industry
- Ireland
- recession
- output volumes
- sustainability
- whole life construction costs
- sports clinic
- Dublin
- energy management savings
- Architectural/Engineering/Construction
- Facilities Management
- questionnaire survey
- business strategy
- design and construction stage
- life cycle costs
- usability
- sustainability impacts