Abstract
Like all developed countries Ireland faces increasing pressure to reduce their carbon footprint. Part of the governments plans include the scaling back of fossil fuel generation facilities and increasing renewable resources. Moneypoint is Irelands only coal fired generation station. In 2025 Moneypoint is due to reach the end of its life cycle. At this point the Irish government will have to make a decission on the future of the generation facility. Currently Moneypoint is responsible for the generation of approximately 10 % of Irelands energy needs.In this paper, the removal of Moneypoint from the Irish generation portfolio will be investigated. A series of simulations have been completed using historic demand and generation data. An initial assessment of the system was completed to verify the assessment technique. All three Moneypoint generation units were then removed and the relibaility of the system dropped dramatically. From this point assessments were completed to determine the quantity of wind generation that would be needed to bring the system back to a stable level. The assessments completed indicate that in 2025 an additional 3000 MW of wind generation will be needed if Moneypoint is removed from the generation portfolio of the country.
| Original language | English |
|---|---|
| Title of host publication | 2019 54th International Universities Power Engineering Conference, UPEC 2019 - Proceedings |
| Publisher | Institute of Electrical and Electronics Engineers Inc. |
| ISBN (Electronic) | 9781728133492 |
| DOIs | |
| Publication status | Published - Sep 2019 |
| Event | 54th International Universities Power Engineering Conference, UPEC 2019 - Bucharest, Romania Duration: 3 Sep 2019 → 6 Sep 2019 |
Publication series
| Name | 2019 54th International Universities Power Engineering Conference, UPEC 2019 - Proceedings |
|---|
Conference
| Conference | 54th International Universities Power Engineering Conference, UPEC 2019 |
|---|---|
| Country/Territory | Romania |
| City | Bucharest |
| Period | 3/09/19 → 6/09/19 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
Fingerprint
Dive into the research topics of 'Reliability Issues Caused By The Retirement Of Large Thermal Generation Facilities: An Irish Case Study'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver