Abstract
Quick response manufacturing (QRM) is a relatively new concept that enfolds all the preceding approaches, namely, just in time (JIT), flexible manufacturing, agile manufacturing, and lean production. QRM is compatible with existing materials requirement planning (MRP) systems and can be implemented efficiently. The ideas from QRM have been highly influential in custom-made engineer-to-order and make-to-order (ETO/MTO) high-mix and low-volume production environments. This study investigates the effectiveness of the POLCA (paired cell overlapping loops of cards) integrated QRM framework for reducing lead time. The POLCA integrated QRM approach was implemented in a precise product manufacturing industry. The industry was facing high penalties due to improper planning and uncontrolled lead times. The implementation of QRM with the POLCA framework indicated optimized production scheduling and significant improvement in lead time and work in process (WIP). After implementing the new manufacturing strategy, the performance parameters showed significant improvement in terms of reducing the percentage loss of profit.
| Original language | English |
|---|---|
| Article number | 3452 |
| Journal | Sustainability (Switzerland) |
| Volume | 13 |
| Issue number | 6 |
| DOIs | |
| Publication status | Published - 2 Mar 2021 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
Keywords
- Lead time
- POLCA
- Production planning and scheduling
- quick response manufacturing (QRM)
Fingerprint
Dive into the research topics of 'Implementation of POLCA integrated QRM framework for optimized production performance-A case study'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver