TY - JOUR
T1 - Dynamic stochastic joint expansion planning of power systems, natural gas networks, and electrical and natural gas storage
AU - Gholami, Arash
AU - Nafisi, Hamed
AU - Askarian Abyaneh, Hossein
AU - Jahanbani Ardakani, Ali
N1 - Publisher Copyright:
© 2021 The Authors. IET Generation, Transmission & Distribution published by John Wiley & Sons Ltd on behalf of The Institution of Engineering and Technology
PY - 2022/4
Y1 - 2022/4
N2 - Over the last decades, electricity generation from natural gas has substantially increased, mostly driven by low natural gas prices due to fracturing and lower extraction costs. The geographic distance between natural gas resources and load centers calls for a holistic tool for joint expansion of power systems and natural gas networks. In this paper, a Dynamic Stochastic Joint Expansion Planning (DSJEP) of power systems and natural gas networks is proposed to minimize the investment and operational costs of power and natural gas systems. Electrical and natural gas storage (ENGS) are considered as an option for decision-makers in the DSJEP problem. The proposed approach takes into account long-term uncertainties in natural gas prices and electric and natural gas demands through scenario realizations. In dynamic planning, more scenario needs more time for computation; therefore, scenario reduction is implemented to eschew unnecessary scenarios. The proposed formulation is implemented on a four-bus electricity system with a five-node natural gas network. To demonstrate the efficiency and scalability of the proposed approach, it is also tested on the IEEE 118-bus system with a 14-node natural gas network. The numerical results demonstrate that ENGS can reduce the total investment cost, up to 52% in the test cases, and operational cost, up to 3%. In this paper, co-planning of power and natural gas systems considering natural gas and electrical storage is represented. Also, electrical and natural gas load growth uncertainties are taken into account to model the real situations. The purpose of the model is to minimize investing and operational costs.
AB - Over the last decades, electricity generation from natural gas has substantially increased, mostly driven by low natural gas prices due to fracturing and lower extraction costs. The geographic distance between natural gas resources and load centers calls for a holistic tool for joint expansion of power systems and natural gas networks. In this paper, a Dynamic Stochastic Joint Expansion Planning (DSJEP) of power systems and natural gas networks is proposed to minimize the investment and operational costs of power and natural gas systems. Electrical and natural gas storage (ENGS) are considered as an option for decision-makers in the DSJEP problem. The proposed approach takes into account long-term uncertainties in natural gas prices and electric and natural gas demands through scenario realizations. In dynamic planning, more scenario needs more time for computation; therefore, scenario reduction is implemented to eschew unnecessary scenarios. The proposed formulation is implemented on a four-bus electricity system with a five-node natural gas network. To demonstrate the efficiency and scalability of the proposed approach, it is also tested on the IEEE 118-bus system with a 14-node natural gas network. The numerical results demonstrate that ENGS can reduce the total investment cost, up to 52% in the test cases, and operational cost, up to 3%. In this paper, co-planning of power and natural gas systems considering natural gas and electrical storage is represented. Also, electrical and natural gas load growth uncertainties are taken into account to model the real situations. The purpose of the model is to minimize investing and operational costs.
UR - http://www.scopus.com/inward/record.url?scp=85114098705&partnerID=8YFLogxK
U2 - 10.1049/gtd2.12277
DO - 10.1049/gtd2.12277
M3 - Article
SN - 1751-8687
VL - 16
SP - 1489
EP - 1506
JO - IET Generation, Transmission and Distribution
JF - IET Generation, Transmission and Distribution
IS - 8
ER -